Chapter 41. Default Standards For Wind Power Devices
Index
- IC 8-1-41-1 Applicability; "Wind Energy Ready Community"
- IC 8-1-41-2 "Dwelling"
- IC 8-1-41-3 "Nonparticipating Property"
- IC 8-1-41-4 "Permit Authority"
- IC 8-1-41-5 "Project Owner"
- IC 8-1-41-6 "Unit"
- IC 8-1-41-7 "Wind Power Device"
- IC 8-1-41-8 "Wind Power Regulation"
- IC 8-1-41-9 Permit Authority Responsible For Enforcing Compliance With Standards; Authority to Adopt Less Restrictive Standards Or to Waive Or Make Less Restrictive Existing Standards; Unit's Planning and Zoning Powers Not Affected
- IC 8-1-41-10 Setback Requirements; Airport; Public Use Highway, Street, Or Road; Nonparticipating Property; Utility Transmission Or Distribution Line; Undeveloped Residential Land; State Park; Corporate Boundaries of Municipality; Blade Tip Height Limitations; Waiver of Restrictions By Nonparticipating Party
- IC 8-1-41-11 Shadow Flicker; Limits With Respect to Nonparticipating Property; Mitigation Efforts; Waiver of Requirement With Consent of Nonparticipating Property Owners
- IC 8-1-41-12 Signal Interference
- IC 8-1-41-13 Sound Level Limitations; Waiver of Requirement With Consent of Affected Property Owners
- IC 8-1-41-14 "Wind Turbine Light Mitigation Technology"; Required After January 1, 2023; Exceptions
- IC 8-1-41-15 Damage to Drainage Infrastructure; Repair; Installation of New Infrastructure
- IC 8-1-41-16 Decommissioning and Site Restoration Plan; Posting of Surety Bond Or Equivalent Security; Required Posting Increments; Adjustment of Bond Or Security After Periodic Reevaluation of Decommissioning Costs; Costs to Be Net of Estimated Salvage Value