Chapter 42. Default Standards For Commercial Solar Energy Systems
Index
- IC 8-1-42-1 Applicability; "Solar Energy Ready Community"
- IC 8-1-42-2 "Commercial Solar Energy System"
- IC 8-1-42-3 "Commercial Solar Regulation"
- IC 8-1-42-4 "Dwelling"
- IC 8-1-42-5 "Nonparticipating Property"
- IC 8-1-42-6 "Permit Authority"
- IC 8-1-42-7 "Project Owner"
- IC 8-1-42-8 "Unit"
- IC 8-1-42-9 Permit Authority Responsible For Enforcing Compliance With Standards; Authority to Adopt Less Restrictive Standards Or to Waive Or Make Less Restrictive Existing Standards; Unit's Planning and Zoning Powers Not Affected
- IC 8-1-42-10 Setback Requirements; Highways, Collector Roads, and Local Roads; Nonparticipating Properties; Landscape Buffer; Height Restriction; Waiver of Setback and Buffer Requirements With Consent of Nonparticipating Property Owner
- IC 8-1-42-11 Ground Cover; Vegetation Plan
- IC 8-1-42-12 Fencing
- IC 8-1-42-13 Underground Cables; Aboveground Infrastructure; Depth of Buried Cables; Cables and Lines Outside of Project Site
- IC 8-1-42-14 Glare Minimization; Adjacent Properties and Roadways; Vehicular Traffic
- IC 8-1-42-15 Signal Interference
- IC 8-1-42-16 Sound Level Limitations; Waiver of Requirement With Consent of Owners of Adjacent Nonparticipating Properties
- IC 8-1-42-17 Damage to Drainage Infrastructure; Repair; Installation of New Infrastructure
- IC 8-1-42-18 Decommissioning and Site Restoration Plan; Posting of Surety Bond Or Equivalent Security; Required Posting Increments; Adjustment of Bond Or Security After Periodic Reevaluation of Decommissioning Costs; Costs to Be Net of Estimated Salvage Value; Project Owner's Notice of Intent to Decommission Cse System; Ground Restoration; Project Owner's Failure to Remove Project Assets; Assets Allowed to Remain In Place With Landowner's Consent
- IC 8-1-42-19 Cse System's Failure to Generate Electricity; Presumed Abandonment; Required Removal of Project Assets; Project Owner's Failure to Remove Assets; Removal of Assets By Permit Authority; Recovery of Costs
- IC 8-1-42-20 "Force Majeure Event"; Cessation of Electricity Generation; Project Owner's Notice to Permit Authority; Failure to Resume Operations; Presumed Abandonment; Project Owner's Failure to Remove Assets; Removal of Assets By Permit Authority; Recovery of Costs