Chapter 9.5. Project Delivery Methods
Index
- IC 8-23-9.5-1 Contracts For Delivery of Certain Projects; Rules; Liability
- IC 8-23-9.5-2 "Cmgc" Or "Construction Manager General Contractor"
- IC 8-23-9.5-3 "Construction Services"
- IC 8-23-9.5-4 "Design Services"
- IC 8-23-9.5-5 "Evaluation Committee"
- IC 8-23-9.5-6 "Gmp"
- IC 8-23-9.5-7 "Person"
- IC 8-23-9.5-8 "Preconstruction Services"
- IC 8-23-9.5-9 "Professional Services Consultant"
- IC 8-23-9.5-10 "Pdb" Or "Progressive Design-Builder"
- IC 8-23-9.5-11 "Project"
- IC 8-23-9.5-12 "Proposal"
- IC 8-23-9.5-13 "Selection Panel"
- IC 8-23-9.5-14 "Request For Proposals"
- IC 8-23-9.5-15 Answering Requests For Proposals; Eligibility
- IC 8-23-9.5-16 Requests For Proposals For Services By Cmgc Or Pdb
- IC 8-23-9.5-17 Evaluation Committee; Selection Panel
- IC 8-23-9.5-18 Negotiations; Limit of Two Projects Per Year
- IC 8-23-9.5-19 Conditional Contracts
- IC 8-23-9.5-20 Replacing Subcontractors
- IC 8-23-9.5-21 Plans and Specifications
- IC 8-23-9.5-22 Cost Estimates; Mutually Acceptable Contract Terms
- IC 8-23-9.5-23 Terminating Contracts
- IC 8-23-9.5-24 Negotiations With Another Cmgc Or Pdb; Terminating Projects
- IC 8-23-9.5-25 Department Requirements
- IC 8-23-9.5-26 Payment and Performance Bonds
- IC 8-23-9.5-27 Class C Infraction; Disqualification
- IC 8-23-9.5-28 Expiration