Chapter 4.6. Transit Progressive Design-Build Contracting
Index
- Ca. Pub. Cont. Code § 22180 [Effective Until 1/1/2029] Definitions
- Ca. Pub. Cont. Code § 22180.1 [Effective Until 1/1/2029] Progressive Design-Build Contracts For Up to 10 Public Works
- Ca. Pub. Cont. Code § 22180.2 [Effective Until 1/1/2029] Guidelines For a Standard Organizational Conflict-Of-Interest Policy
- Ca. Pub. Cont. Code § 22180.3 [Effective Until 1/1/2029] Procurement Process For Progressive Design-Build Projects
- Ca. Pub. Cont. Code § 22180.4 [Effective Until 1/1/2029] Payment and Performance Bonds
- Ca. Pub. Cont. Code § 22180.5 [Effective Until 1/1/2029] Contract and Preconstruction
- Ca. Pub. Cont. Code § 22180.6 [Effective Until 1/1/2029] Types of Subcontractors ; Awarding Construction Subcontracts
- Ca. Pub. Cont. Code § 22180.7 [Effective Until 1/1/2029] Retention Proceeds
- Ca. Pub. Cont. Code § 22180.8 [Effective Until 1/1/2029] Report On the Use of the Progressive Design-Build Process
- Ca. Pub. Cont. Code § 22180.9 [Effective Until 1/1/2029] No Authority to Perform Construction Inspection Services Regarding State Highway System
- Ca. Pub. Cont. Code § 22180.10 [Effective Until 1/1/2029] Construction
- Ca. Pub. Cont. Code § 22180.11 [Effective Until 1/1/2029] Repealer