Ala. Code § 9-16-82 (1975) Permits - Required; Term; Successor In Interest; Termination; Renewal; Application

LibraryAlabama Statutes
Edition2023
CurrencyCurrent with legislation from the 2023 Regular and Special Sessions.
Year2023
CitationAla. Code § 9-16-82 (1975)

(a) No person shall engage in surface coal mining operations at a particular location except as a subcontractor of the permittee of that location until such person has been issued a permit by the regulatory authority for that location in accordance with the provisions of this section. The term of a permit shall not exceed five years and shall authorize the permittee to engage in surface coal mining operations within the permitted area, unless sooner suspended or revoked in accordance with the provisions of this article. However, if the applicant demonstrates that a specified longer term is reasonably needed to allow the applicant to obtain the necessary financing for equipment and the opening of the operation and that the application is full and complete for such specified longer term, the regulatory authority may grant a permit for such longer term. A successor in interest of a permittee who applies for a new permit within 30 days of succeeding of such interest and who is able to obtain the equivalent bond coverage of the original permittee may continue surface coal mining and reclamation operations according to the approved mining and reclamation plan of the original permittee until such successor's application is granted or denied. If a permittee qualified under this article succeeds another at any uncompleted operation by sale, assignment, lease or otherwise, the director may release the first permittee from all liability for permit and bond requirements of this article after the successor permittee has posted adequate bond and the successor permittee assumes full liability for mining and reclamation procedures established herein.

(b) A permit shall terminate prior to its expiration date if the permittee has not commenced the surface coal mining operations covered by such permit within 3 years of the issuance of the permit; provided, that the regulatory authority may grant reasonable extensions of time upon a showing that such extensions are necessary by reason of litigation precluding such commencement or threatening substantial economic loss to the permittee, or by reason of conditions beyond the control and without the fault or negligence of the permittee; provided further for the purposes of this section, that with respect to coal to be mined for use in a synthetic fuel facility or specific major electric generating facility, the permittee shall be deemed to have commenced surface mining operations at such time as the construction of the synthetic fuel or generating facility as initiated.

To continue reading

Request your trial

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT