SDCL 10-35-1.6 Amount of Tax Exemption During Construction of Qualifying Power Generation Facility

LibrarySouth Dakota Statutes
Edition2023
CurrencyCurrent through the 2023 Legislative Session
Year2023
CitationSDCL 10-35-1.6

During the construction period of a qualifying power generation facility, the exemption provided in § 10-35-1.5 shall be as follows:

(1) For the first legal assessment date after the construction date of the power generation facility, as provided in § 10-35-9, upon all value in excess of ten percent of the amount provided in § 10-35-1.5;

(2) For the second legal assessment date after the construction date of the power generation facility, as provided in § 10-35-9, upon all value in excess of twenty percent of the amount provided in § 10-35-1.5; and