33 U.S.C. § 2735 Equipment and Personnel Requirements Under Tank Vessel and Facility Response Plans

LibraryUnited States Statutes
Edition2023
CurrencyCurrent through P.L. 118-30 (published on www.congress.gov on 12/21/2023)
Year2023
Citation33 U.S.C. § 2735

(a) In general

In addition to the requirements for response plans for vessels established by section 1321(j) of this title, a response plan for a tanker loading cargo at a facility permitted under the Trans-Alaska Pipeline Authorization Act ( 43 U.S.C. 1651 et seq.), and a response plan for such a facility, shall provide for-

(1) prepositioned oil spill containment and removal equipment in communities and other strategic locations within the geographic boundaries of Prince William Sound, including escort vessels with skimming capability; barges to receive recovered oil; heavy duty sea boom, pumping, transferring, and lightering equipment; and other appropriate removal equipment for the protection of the environment, including fish hatcheries;

(2) the establishment of an oil spill removal organization at appropriate locations in Prince William Sound, consisting of trained personnel in sufficient numbers to immediately remove, to the maximum extent practicable, a worst case discharge or a discharge of 200,000 barrels of oil, whichever is greater;

(3) training in oil removal techniques for local residents and individuals engaged in the cultivation or production of fish or fish products in Prince William Sound;

(4) practice exercises not less than 2 times per year which test the capacity of the equipment and personnel required under this paragraph; and

(5) periodic testing and certification of equipment required under this paragraph, as required by the Secretary.

To continue reading

Request your trial

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT