43 U.S.C. § 2405 Feasibility Studies

LibraryUnited States Statutes
Edition2023 Edition
CurrencyCurrent through P.L. 118-19 (published on www.congress.gov on 10/06/2023)

(a) In general

On completion of an appraisal report under section 2404(c) of this title that recommends undertaking a feasibility study and subject to the availability of appropriations, the Secretary shall-

(1) in cooperation with a non-Federal project entity, carry out a study to determine the feasibility of the proposed rural water supply project;

(2) receive and review a feasibility study that is-

(A) developed by the non-Federal project entity, with or without support from the Secretary; and

(B) submitted to the Secretary by the non-Federal project entity; or

(3)

(A) provide a grant to, or enter into a cooperative agreement with, a non-Federal project entity to conduct a feasibility study, for submission to the Secretary, if the Secretary determines that-

(i) the non-Federal entity is qualified to complete the feasibility study in accordance with the criteria promulgated under subsection (d); and

(ii) using the non-Federal project entity to conduct the feasibility study is a cost-effective alternative for completing the appraisal investigation; or

(B) if the Secretary determines not to provide a grant to, or enter into a cooperative agreement with, a non-Federal project entity under subparagraph (A), provide to the non-Federal project entity notice of the determination, including an explanation of the reason for the determination.

(b) Review of non-Federal feasibility studies

(1) In general

In conducting a review of a feasibility study submitted under paragraph (2) or (3) of subsection (a), the Secretary shall-

(A) in accordance with the feasibility factors described in subsection (c) and the criteria promulgated under subsection (d), assess the completeness of the feasibility study; and

(B) if the Secretary determines that a feasibility study is not complete, notify the non-Federal entity of the determination.

(2) Revisions

If the Secretary determines under paragraph (1)(B) that a feasibility study is not complete, the non-Federal entity shall pay any costs associated with revising the feasibility study.

(c) Feasibility factors

Feasibility studies authorized or reviewed under this subchapter shall include an assessment of-

(1) near- and long-term water demand in the area to be served by the rural water supply project;

(2) advancement of public health and safety of any existing rural water supply project and other benefits of the proposed rural water supply project;

(3) alternative new water supplies in the study area, including any opportunities to treat and use low-quality water, nonpotable water, water reuse-based supplies, and brackish and saline waters through innovative and economically viable treatment technologies;