(a) Boundary specifications; criteria; temporary use of additional lands
The Secretary concerned shall specify the boundaries of each right-of-way as precisely as is practical. Each right-of-way shall be limited to the ground which the Secretary concerned determines (1) will be occupied by facilities which constitute the project for which the right-of-way is granted, issued, or renewed, (2) to be necessary for the operation or maintenance of the project, (3) to be necessary to protect the public safety, and (4) will do no unnecessary damage to the environment. The Secretary concerned may authorize the temporary use of such additional lands as he determines to be reasonably necessary for the construction, operation, maintenance, or termination of the project or a portion thereof, or for access thereto.
(b) Terms and conditions of right-of-way or permit
Each right-of-way or permit granted, issued, or renewed pursuant to this section shall be limited to a reasonable term in light of all circumstances concerning the project. In determining the duration of a right-of-way the Secretary concerned shall, among other things, take into consideration the cost of the facility, its useful life, and any public purpose it serves. The right-of-way shall specify whether it is or is not renewable and the terms and conditions applicable to the renewal.
(c) Applicability of regulations or stipulations
Rights-of-way shall be granted, issued, or renewed pursuant to this subchapter under such regulations or stipulations, consistent with the provisions of this subchapter or any other applicable law, and shall also be subject to such terms and conditions as the Secretary concerned may prescribe regarding extent, duration, survey, location, construction, maintenance, transfer or assignment, and termination.
(d) Submission of plan of construction, operation, and rehabilitation by new project applicants; plan requirements
The Secretary concerned prior to granting or issuing a right-of-way pursuant to this subchapter for a new project which may have a significant impact on the environment, shall require the applicant to submit a plan of construction, operation, and rehabilitation for such right-of-way which shall comply with stipulations or with regulations issued by that Secretary, including the terms and conditions required under section 1765 of this title.
(e) Regulatory requirements for terms and conditions; revision and applicability of regulations