46 U.S.C. § 53207 National Security Requirements

LibraryUnited States Statutes
Edition2023 Edition
CurrencyCurrent through P.L. 118-19 (published on www.congress.gov on 10/06/2023)

(a) CONTINGENCY AGREEMENT REQUIRED.-The Secretary shall include in each Operating Agreement under this chapter a requirement that the Contractor enter into a Contingency Agreement with the Operating Agency. The Operating Agency shall negotiate and enter into a Contingency Agreement with each Contractor as promptly as practicable after the Contractor has entered into an Operating Agreement under this chapter.

(b) TERMS OF CONTINGENCY AGREEMENT.-

(1) IN GENERAL.-A Contingency Agreement under this section shall require that a Contractor for a vessel covered by an Operating Agreement under this chapter make the vessel, including all necessary resources to engage in Cable Services required by the Operating Agency, available upon request by the Operating Agency.

(2) TERMS.-

(A) IN GENERAL.-The basic terms of a Contingency Agreement shall be established (subject to subparagraph (B)) by the Operating Agency.

(B) ADDITIONAL TERMS.-The Operating Agency and a Contractor may agree to additional or modifying terms appropriate to the Contractor's circumstances.

(c) DEFENSE MEASURES AGAINST UNAUTHORIZED SEIZURES.-

(1) The Contingency Agreement shall require that any vessel operating under the direction of the Operating Agency operating in area that is designated by the Coast Guard as an area of high risk of piracy shall be equipped with, at a minimum, appropriate non-lethal defense measures to protect the vessel and crew from unauthorized seizure at sea.

(2) The Secretary of Defense and the Secretary of the department in which the Coast Guard is operating shall jointly prescribe the non-lethal defense measures that are required under this paragraph.

(d) PARTICIPATION AFTER EXPIRATION OF OPERATING AGREEMENT.-Except as provided by section 53205(d), the Operating Agency may not require, through a Contingency Agreement or an Operating Agreement, that a Contractor continue to participate in a Contingency Agreement after the Operating Agreement with the Contractor has expired according to its terms or is otherwise no longer in effect.