33 U.S.C. § 579a Corps Budgeting; Project Deauthorizations; Comprehensive Backlog Report

LibraryUnited States Statutes
Edition2023
CurrencyCurrent through P.L. 118-34 (published on www.congress.gov on 12/26/2023), except for [P. L. 118-31]
Year2023
Citation33 U.S.C. § 579a

(a) Funds to be obligated for construction to avoid deauthorization

Any project authorized for construction by this Act shall not be authorized after the last day of the 5-year period beginning on November 17, 1986, unless during such period funds have been obligated for construction, including planning and designing, of such project.

(b) Transmission to Congress of list of unconstructed projects or separable elements authorized but not receiving obligations during 10 fiscal years preceding transmission; two-year updates of list

(1) Not later than one year after November 17, 1986, the Secretary shall transmit to Congress a list of unconstructed projects, or unconstructed separable elements of projects, which have been authorized, but have received no obligations during the 10 full fiscal years preceding the transmittal of such list. A project or separable element included in such list is not authorized after December 31, 1989, if funds have not been obligated for construction of such project or element after November 17, 1986, and before December 31, 1989.

(2) COMPREHENSIVE CONSTRUCTION BACKLOG AND OPERATION AND MAINTENANCE REPORT.-

(A) IN GENERAL.-The Secretary, once every 2 years, shall compile and publish-

(i) a complete list of all projects and separable elements of projects of the Corps of Engineers that are authorized for construction but have not been completed;

(ii) a complete list of all feasibility studies of the Corps of Engineers that Congress has authorized the Secretary to carry out for which a Report of the Chief of Engineers has not been issued;

(iii) a complete list of all environmental infrastructure projects authorized by Congress under section 219 of the Water Resources Development Act of 1992 (106 Stat. 4835); and

(iv) a list of major Federal operation and maintenance needs of projects and properties under the control of the Corps of Engineers.

(B) REQUIRED INFORMATION.-The Secretary shall include on each list developed under clause (i), (ii), or (iii) of subparagraph (A) for each feasibility study, project, and separable element on that list-

(i) the date of authorization of the feasibility study, project, or separable element, including any subsequent modifications to the original authorization;

(ii) the original budget authority for the feasibility study, project, or separable element;

(iii) a brief description of the feasibility study, project, or separable element;

(iv) the estimated date of completion of the feasibility study, project, or separable element, assuming all capability is fully funded;