16 U.S.C. § 1278 - Restrictions on water resources projects
Cite as | 16 U.S.C. § 1278 |
(a) Construction projects licensed by Federal Energy Regulatory Commission
The Federal Energy Regulatory Commission shall not license the construction of any dam, water conduit, reservoir, powerhouse, transmission line, or other project works under the Federal Power Act (41 Stat. 1063), as amended ( 16 U.S.C. 791a et seq.), on or directly affecting any river whi...
(b) Construction projects on rivers designated for potential addition to system
The Federal Energy Regulatory Commission shall not license the construction of any dam, water conduit, reservoir, powerhouse, transmission line, or other project works under the Federal Power Act, as amended [ 16 U.S.C. 791a et seq.], on or directly affecting any river which is listed in section 1276(a) of this title, and no department or agency of the United States shall assist by loan, grant, license, or otherwise in the construction of any water resources project that would have a direct and adverse effect on the values for which such river might be designated, as determined by the Secretary responsible for its study or approval-
(i) during the ten-year period following October 2, 1968, or for a three complete fiscal year period following any Act of Congress designating any river for potential addition to the national wild and scenic rivers system, whichever is later, unless, prior to the expiration of the relevant period, the Secretary of the Interior and, where national forest lands are involved, the Secretary of Agriculture, on the basis of study, determine that such river should not be included in the national wild and scenic rivers system and notify the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives, in writing, including a copy of the study upon which the determination was made, at least one hundred and eighty days while Congress is in session prior to publishing notice to that effect in the Federal Register: Provided, That if any Act designating any river or rivers for potential addition to the national wild and scenic rivers system provides a period for the study or studies which exceeds such three complete fiscal year period the period provided for in such Act shall be substituted for the three complete fiscal year period in the provisions of this clause (i); and
(ii) during such interim period from the date a report is due and the time a report is actually submitted to the Congress; and
(iii) during such additional period thereafter as, in the case of any river the report for which is submitted to the President and the Congress, is necessary for congressional consideration thereof or, in the case of any river recommended to the Secretary of the Interior for inclusion in the national wild and scenic rivers system under section 1273(a)(ii) of this title, is necessary for the Secretary's consideration thereof, which additional period, however, shall not exceed three years in the first case and one year in the second.