Chapter 32. Colorado River Basin Project
Subchapter I. Objectives
Subchapter II. Investigations and Planning
- 43 U.S.C. § 1511 Reconnaissance Investigations By Secretary of the Interior; Reports; 10-Year Moratorium On Water Importation Studies
- 43 U.S.C. § 1511a Cooperation and Participation By Secretary of the Army With Federal, State, and Local Agencies
- 43 U.S.C. § 1512 Mexican Water Treaty
- 43 U.S.C. § 1513 Importation of Water; Protection of Exporting Areas
- 43 U.S.C. § 1514 Authorization of Appropriations
Subchapter III. Authorized Units; Protection of Existing Uses
- 43 U.S.C. § 1521 Central Arizona Project
- 43 U.S.C. § 1522 Orme Dam and Reservoir
- 43 U.S.C. § 1523 Power Requirements of Central Arizona Project and Augmentation of Lower Colorado River Basin Development Fund
- 43 U.S.C. § 1524 Water Furnished From Central Arizona Project
- 43 U.S.C. § 1525 Cost of Main Stream Water of Colorado River
- 43 U.S.C. § 1526 Water Salvage Programs
- 43 U.S.C. § 1527 Fish and Wildlife Conservation and Development
- 43 U.S.C. § 1528 Authorization of Appropriations
Subchapter IV. Lower Colorado River Basin Development Fund
Subchapter V. General Provisions
- 43 U.S.C. § 1551 Construction of Colorado River Basin Act
- 43 U.S.C. § 1552 Criteria For Long-Range Operation of Reservoirs
- 43 U.S.C. § 1553 Upper Colorado River Basin; Rights to Consumptive Uses Not to Be Reduced Or Prejudiced; Duties and Powers of Commission Not Impaired
- 43 U.S.C. § 1554 Federal Reclamation Laws
- 43 U.S.C. § 1555 Federal Power Act Inapplicable to Colorado River Between Hoover Dam and Glen Canyon Dam
- 43 U.S.C. § 1556 Definitions