43 U.S.C. § 1523 Power Requirements of Central Arizona Project and Augmentation of Lower Colorado River Basin Development Fund

LibraryUnited States Statutes
Edition2023
CurrencyCurrent through P.L. 118-34 (published on www.congress.gov on 12/26/2023), except for [P. L. 118-31]
Year2023
Citation43 U.S.C. § 1523

(a) Engineering and economic studies

The Secretary is authorized and directed to continue to a conclusion appropriate engineering and economic studies and to recommend the most feasible plan for the construction and operation of hydroelectric generating and transmission facilities, the purchase of electrical energy, the purchase of entitlement to electrical plant capacity, or any combination thereof, including participation, operation, or construction by non-Federal entities, for the purpose of supplying the power requirements of the Central Arizona Project and augmenting the Lower Colorado River Basin Development Fund: Provided, That nothing in this section or in this chapter contained shall be construed to authorize the study or construction of any dams on the main stream of the Colorado River between Hoover Dam and Glen Canyon Dam.

(b) Construction of thermal generating powerplants; agreements for acquisition by United States of portions of plant capacity

If included as a part of the recommended plan, the Secretary may enter into agreements with non-Federal interests proposing to construct thermal generating powerplants whereby the United States shall acquire the right to such portions of their capacity, including delivery of power and energy over appurtenant transmission facilities to mutually agreed upon delivery points, as he determines is required in connection with the operation of the Central Arizona Project. When not required for the Central Arizona Project, the power and energy acquired by such agreements may be disposed of intermittently by the Secretary for other purposes at such prices as he may determine, including its marketing in conjunction with the sale of power and energy from Federal powerplants in the Colorado River system so as to produce the greatest practicable amount of power and energy that can be sold at firm power and energy rates. The agreements shall provide among other things, that-

(1) the United States shall pay not more than that portion of the total construction cost, exclusive of interest during construction, of the powerplants, and of any switchyards and transmission facilities serving the United States, as is represented by the ratios of the respective capacities to be provided for the United States therein to the total capacities of such facilities. The Secretary shall make the Federal portion of such costs available to the non-Federal interests during the construction period, including the period of preparation of designs and specifications, in such installments as will facilitate a timely construction schedule, but no funds other than for preconstruction activities shall be made available by the Secretary until he determines that adequate contractual arrangements have been entered into between all the affected parties covering land, water, fuel supplies, power (its availability and use), rights-of-way, transmission facilities and all other necessary matters for the thermal generating powerplants;

To continue reading

Request your trial

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT